| โครงการ - ผลงาน - เกียรติประวัติ : | 
Company name 		: T.M.U.C.B (Asia) co., Ltd. (Owner) 
Duration From		: OCT 2000 - AUG 2004 (3.11 years) 
Position 		: Chief Engineer/Factory Manager 
Salary 			: 55,000 Bath Thai 
Project 	 	a)	: Viet-Thai Zinc Industry Joint Venture Company (Hanoi Vietnam 
: 1 Factory, 1 Head Office, 1 Canteen, Staff House 
Scope of work 	: The Design Routing Incoming feeder for underground of High Voltage 35 KVA. Standard Viet num. 
	: The Consultant and Management Control work. 
: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works. 
: The Consultant and Construction Management Control works for Project 
: The Supervision to Working Procedures or Project Objective  
: Project Master Programmed and date for Completion. 
: The Supervision defect clearance method, practical completion method head over method eye. 
: Interim Payment Procedures. 
: Variation Procedures, method of measurement. 
: General Document Flow. General Document Flow. 
Company name 	: Project Asia Co., Ltd. Project and Construction Management (Consultant) 
			: 52/33 Soi  Nananua  Sukhumvit  23 Bangkok 10110 
Duration From		: NOV 1993 - SEP 2000 (7 years) 
Position 		: M&E Engineer/ Electrical Engineer 
Salary 			: 39,000 Bath Thai 
Project	 	a)	: The Four Sea son Hotel.  
			: 3-Storey and 4-Storey Building 10 Unit. 
b)	: Sheraton Grande Sukhumvit (5 Star Hotel) 
: 49-Storey with one basement 
c)	: State Tower Project 
			: 63- Storey with 6 basement & 3 Storey Dome 
 
Scope of work	: Design Routing Incoming feeder for underground of High Voltage -Sub-Station 69KV.The Supply to 4 Loop 8Feeder 24 line 
: The Consultant and Management Control work s for High Rise - Building and Factory all      Project. 
: The prepare document for Electrical Tender and Bill of Quantity. 
: The Revise Shop Drawing for Electrical Engineering to work. 
: The Supervision and Installed, Renovate for Fire alarm, PABX, MATV CCTV Communication work. 
: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works. 
: The Consultant and Construction Management Control works for Project 
: The Supervision to Working Procedures or Project Objective  
: Project Master Programmed and date for Completion. 
: The Supervision defect clearance method, practical completion method head over method eye. 
: Interim Payment Procedures. 
: Variation Procedures, method of measurement. 
: General Document Flow. General Document Flow. 
: The Revise Shop Drawing for Electrical Engineering to work. 
: The Supervision and Installed, Renovate for Fire alarm, PABX, MATV CCTV Communication work. 
: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works. 
: The Consultant and Construction Management Control works for Project 
: The Supervision to Working Procedures or Project Objective  
: Project Master Programmed and date for Completion. 
: The Supervision defect clearance method, practical completion method head over method eye. 
: Interim Payment Procedures. 
: Variation Procedures, method of measurement. 
 
Company name 	: Samsung Construction Co., Ltd. (Main Contractor) 
Duration From		: DEC 1991 - SEP1993 (2 years) 
Position		: Project Engineer (Electrical Engineering Division)  
Salary 			: 22,000 Bath Thai 
Scope of work		: To estimated and evaluate for Electrical Tender and Bill of Quantity. 
			: Design and Supervision the Shop drawing for Electrical Engineering to work. 
			: Installed the Equipment Factory and wiring Control work.  
Project  	a)	: Samsung Electronics Co., Ltd.  
			: 4 Factory, 1 Canteen, 1 Head Office, 1 Guard house 
: General Document Flow. General Document Flow. 
 
Company name		: Electricity Generating Authority of Thailand. Lampang 
Duration From		: OCT 1986 - SEP 1991 (5.1 years) 
Position		: Electrical Engineer 
Salary			: 13,070 Bath Thai 
Scope of work		: Supervision and Inspection Generating Supply Factory No.3 
			: Installation High Voltage Overheard Transmission Line. 
 
 
 
 
 
 
 
Responsibility & Working Experience as Follows:  
a)	: The prepare document for Electrical Tender and Bill of Quantity. 
b)	: The Design Routing Incoming feeder for underground of High Voltage -Sub-Station 69 KV. To Supply 4 Loop 8   Feeder 24 line for Electrical. 
c)	: The Design and Supervision the High & Low Voltage from Transformers to SF6 High Voltage Switchgears and Ring Main Unit 3,200 Amp. 
d)	: Supervision the Installed Transformers Size 2,500 KVA.12 Set and -1,250KVA.2 Set, Main Circuit Breaker 6,300 Amp.12 Ea. And Bus way - 3,200 Amp.22 Feeder. 
e)	: The Revise Shop Drawing for Electrical Engineering to work. 
f)	: The Consultant and Management Control work for High Rise - Building and Factory all Project. 
g)	: Installed & Maintenance and Renovate the Equipment for High Rise Building, Pool Villas and Factory of Electrical System. 
h)	:The Skill Literacy Computer Program Microsoft Office, Excel, Auto -Cad 2007 
i)	: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works. 
j)	:The Consultant and Construction Management Control works for Project 
k)	:The Supervision to Working Procedures or Project Objective  
: Project Master Programmed and date for Completion. 
: The Supervision defect clearance method, practical completion method head over method eye. 
: Interim Payment Procedures. 
: Variation Procedures, method of measurement. 
: General Document Flow. General Document Flow. 
l)	: The monitor all construction project for cost Effectiveness as well as budget controlling and preparing BOQ 
m)	: The monitor store opening schedule and align all required resources to meet the targets while maintaining and meeting the quality standard. 
n)	: The management construction process and engineering activities comply with property lows and requlation  
o)	: Provide Property coordination of the site activities, Land Lord, customer and contractor. 
p)	: The complies with project Specification, procedures etc. 
q)	: The Handover for project to customers. 
 |